Project Duration
April 2022 – October 2024 (30 months)
Team
26 employees led by Chief Engineer: Benjamin Chen
Estimated Cost
$2.8 million
The home owner started a renovation project on this old hard to heat farmhouse in rural wales. They invested in internal insulation and some underfloor heating downstairs and new radiators upstairs. The single OCHSNER Air Hawk is able to heat this beautiful building with ease. Even on the coldest of days.
Analyze existing processes (4 months)
Develop connected architecture for machines and devices (6 months)
Integrate AI for predictive optimization (8 months)
Deploy automated quality monitoring tools (5 months)
Test the system in a controlled production environment (4 months)
Roll out across production lines (3 months)
Legacy manufacturing processes are often rigid and inefficient, making it hard for companies to respond quickly to market demands or optimize resource utilization.
Boosts industrial productivity and supports sustainable practices by reducing energy consumption, material waste, and production errors.