Project Duration
May 2023 – July 2025 (26 months)
Team
24 employees led by Chief Engineer: Sarah Lee
Estimated Cost
$2.5 million
This project required two OCHSNER Air 41 heat pumps to replace the outdated oil heating system. The plant room is an outbuilding and the evaporators are across the drive although the sound levels are none existent the owner still wanted them away from the property to preserve the exterior of the property.
Define system requirements and warehouse design (4 months)
Choose robotics, software, and hardware components (5 months)
Implement WMS with robotic operations (7 months)
Conduct trials and fine-tune processes (6 months)
Train staff and transition to full automation (3 months)
Provide monitoring and maintenance (1 month)
Manual warehouse management leads to inefficiencies, stock inaccuracies, and slow order fulfillment, causing delays and increased operational costs.
Enhances supply chain efficiency, reduces carbon emissions by optimizing logistics, and improves customer satisfaction through faster delivery.
The automated warehouse system increases operational speed, reduces labor costs, and enhances customer satisfaction through faster delivery.